GARAGE- JORDAN

BEFORE- The existing asphalt driveway terminates with a small parking pad.
DURING- The foundation, slab, and all concrete block work is complete. The garage shell is complete and the roof deck is on and ready for shingles.
DURING- GAF Timberline Ultra Architectural shingles are installed to match the main house roof. A ridge vent was installed along the peak of the roof with a small gap in the middle to allow for the installation of a Cupolla
AFTER- The garage is complete. Four lantern style sconce porch lights adorn the brick face of the garage . Two 9'x7 1/2' garage doors with a 5' wide double door provide access to the garage. The 5' double door will be used for the mower etc.
AFTER- The garage is complete. Four lantern style sconce porch lights adorn the brick face of the garage . Two 9'x7 1/2' garage doors with a 5' wide double door provide access to the garage. The 5' double door will be used for the mower etc.
AFTER- The garage is complete. Four lantern style sconce porch lights adorn the brick face of the garage . Two 9'x7 1/2' garage doors with a 5' wide double door provide access to the garage. The 5' double door will be used for the mower etc..
AFTER- The garage is complete. Four lantern style sconce porch lights adorn the brick face of the garage . Two 9'x7 1/2' garage doors with a 5' wide double door provide access to the garage. The 5' double door will be used for the mower etc.
AFTER- The garage is complete. Four lantern style sconce porch lights adorn the brick face of the garage . Two 9'x7 1/2' garage doors with a 5' wide double door provide access to the garage. The 5' double door will be used for the mower etc.
BEFORE- This before picture gives a glimpse of the house that the garage will match. It's a brick rancher and the garage is being built to blend in with it seamlessly.
DURING- The garage foundation and slab are complete. Framing is beginning as the sill plate is installed.
DURING- Framing of the walls is complete, the roof trusses are set, and the roof deck and roof overhangs are on.
DURING- The roof  is watertight with all shingle work finished. The brick work is underway as the first courses are set along the bottom of the wall.
AFTER- garage is complete. The brick and the mortar are an almost identical match to that of the house. The brickmason spent over a month searching for just the right brick and just the right color mortar.
AFTER- garage is complete. The brick and the mortar are an almost identical match to that of the house. The brickmason spent over a month searching for just the right brick and just the right color mortar.
AFTER- garage is complete. The brick and the mortar are an almost identical match to that of the house. The brickmason spent over a month searching for just the right brick and just the right color mortar.
AFTER- garage is complete. The brick and the mortar are an almost identical match to that of the house. The brickmason spent over a month searching for just the right brick and just the right color mortar.
AFTER- The garage is complete. Four lantern style sconce porch lights adorn the brick face of the garage . Two 9'x7 1/2' garage doors with a 5' wide double door provide access to the garage. The 5' double door will be used for the mower etc.
AFTER- The garage is complete. Four lantern style sconce porch lights adorn the brick face of the garage . Two 9'x7 1/2' garage doors with a 5' wide double door provide access to the garage. The 5' double door will be used for the mower etc.
AFTER- The garage is complete. Four lantern style sconce porch lights adorn the brick face of the garage . Two 9'x7 1/2' garage doors with a 5' wide double door provide access to the garage. The 5' double door will be used for the mower etc.
DURING- The walls are framed...but the header beams above the doors have not been installed.
DURING- wall framing is complete, roof trusses set, and front half of the roof has plywood .
DURING- Day 3 of brick work
AFTER- the side "Box Bay" casement window was built to match the one on the house, with a real copper roof. The small blue stone and brick porch landing matches the front porch as well.
AFTER- the side "Box Bay" casement window was built to match the one on the house, with a real copper roof. The small blue stone and brick porch landing matches the front porch as well.
BEFORE - view from the left rear corner of where the garage will sit.
DURING- trench has been dug for the footings.
DURING- footings and concrete block work is complete, the slab has been poured, and the sill plate is on – framing begins.
DURING- walls are framed
DURING- roof trusses have been set, roof overhangs constructed, and roof deck installed.
DURING- roof shingles are on and day two of brickwork is complete.
DURING- scaffolding is erected to work on the higher courses of brick
AFTER- That is one beautiful piece of work!
DURING- trenches for the footings have been dug and inspected
DURING- framing is almost complete
AFTER- The copper roof on the box bay window really gives a nice accent to the side of this garage.
DURING- View of the side of the garage straight on – foundation and slab work is complete
DURING- Framing is almost complete – the windows and door will going next.
AFTER- The roof has a 7/12 pitch putting the peak of the roof approximately 18 feet above the ground.
DURING- standing inside of what will be the corner of the garage looking at the trenches that have been dug for the footings
DURING- All foundation, block work, and concrete slab work is complete. The concrete slab is as smooth as a babies butt!
DURING- interior view of the garage as the walls go up.
DURING- interior view of the garage as the framing progresses – roof trusses are on – and roof deck will be next.
DURING- all framing is complete, and the entire garage has been insulated. The ceiling has been insulated with R 49 insulation and the walls with R 19 insulation
DURING- all sheet rock has been the hung. 12 foot long sheets were installed to minimize the number of seams
AFTER- interior view after completion. The interior was finished no different then a family room with baseboard molding, window and door casing, contrasting colors for walls and ceiling etc.
AFTER- A heavy duty aluminum drop staircase provides access to the loft above.
AFTER- The attic loft measures 30' x 12'. The walls were lined with 4 foot high plywood to provide a backstop for storage.
AFTER- another view of the loft from the opposite end. The lights in the loft are controlled by a wall switch down in the garage by the drop staircase
AFTER- stainless steel grab bars were installed on each side of the drop staircase opening to provide handholds for entering and exiting the attic.
AFTER- another view of the completed garage interior
DURING- standing inside the corner of the garage before the walls are put up
DURING- framing on the walls is almost complete – the header beams above the garage doors still need to be installed.
DURING- Roof trusses are set and the roof deck is being installed
DURING- all framing is complete and all installation is complete. Time to hang sheet rock! Note above the garage doors are 14 inch LVL engineered microlam beams
DURING- all sheet rock has been hung, now it's time to tape, finish, and sand before everything gets painted.
AFTER- Nice view of the completed garage interior. Note there are 12 recessed lights in the front of the garage and 4 fluorescent lights in the back of the garage… Which will be a work area
AFTER- View of the garage interior with the garage doors open
AFTER- another view of the completed garage interior. To the right of the side entrance door is a circuit panel. This is a subpanel – 100 amp – which has all the circuits that control the garage lighting, outlets, alarm system, etc.
AFTER- another view of the completed interior
AFTER- Close-up view of the box bay casement Lundell. The copper roof and the construction of the window itself exactly match the main window on the front of the house
DESIGN DRAWINGS- these design drawings were part of the contract… And used to build the garage
DESIGN DRAWINGS- side elevation
DESIGN DRAWINGS- Floorplan / Platt drawing
DESIGN DRAWINGS- Floorplan
DESIGN DRAWINGS- roof truss layout and attic floor plan and drop staircase specs
DESIGN DRAWINGS- framing diagram
0307
AFTER- Wide angle view of the house and the new garage shows how the new garage neatly blends in with the house and driveway.
AFTER- Wide angle view of the house and the new garage shows how the new garage neatly blends in with the house and driveway.
AFTER- Panoramic view of the house and the new garage shows how the new garage exactly matches the architecture of the house.

Home Improvement Contractor in Baltimore, Maryland

NLT Construction is one of the most reputable home remodeling companies in Maryland. We offer a variety of services to improve the look of your home. Learn more about us >

CONTACT US

5607 Williams Road
Hydes, MD 21082
410-922-6475 office
443-313-3082 fax

© 2025 NLT Construction Web Design by Accent Interactive

  • Home
  • About Us
  • Services
    • Additions
    • Sunrooms
    • Bathrooms
    • Kitchens
    • Basements & Attics
    • Garages & Carports
    • Garage Conversions
    • Decks & Porches
    • General Construction
    • Built-Ins
  • Video
  • Contact